New tank support frames installed beneath process tanks in a manufacturer's finishing room
The new support frames, set in place under the tank row.

At the end of August our on-site crew finished an installation for a large cabinet manufacturer: new support frames under a row of process tanks in the customer’s finishing room.

The room is rated for flammable materials, so no welding or open flame is allowed inside it. That ruled out building anything in place. Every piece was fabricated in our shop in Broadway and brought in ready to install.

Getting the tanks out of the way took a different route than the door. Our crew cut an opening in the roof, and a crane working from outside lifted each tank, held it while the new frame was set beneath it, and lowered it back into place.

Crane rigged on the roof of a manufacturing plant during a tank installation
Working from the roof with the crane.
Looking down through a roof opening into a finishing room with process tanks below
The roof opening, looking down into the tank room.

The job is a good example of how our on-site work usually runs: the shop and the field crew on the same project, planned around the rules of the customer’s floor.

Have equipment that needs to be set, moved, or supported in a tight or restricted space? See our Millwright & Rigging and Fabrication services, or call us at 540-896-6758.